Pomona Apex RoofingGet matched with vetted Pomona roofers in minutes.Get on the list

Pomona, CA

Storm damage roofing in Pomona

The first hour after a storm is about stopping water, not about getting the best price. Those are two separate jobs and they happen in that order.

Describe the storm damage job

Three questions, then the address. Up to three Pomona contractors who do this work.

Free · No obligation

Join the waiting list

No company gets your details until you say yes to it by name.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, and no obligation to anyone.

Before you let anybody on the roof

The things worth pinning down on a storm damage job. A contractor who has not raised them has not looked properly.

  • A written scope of the work, line by line
  • What the emergency tarp costs, separate from the repair
  • Photographs of the damage before any work happens
  • Whether the contractor is licensed and insured in this state
  • A local address you could actually drive to

If two contractors describe the damage differently, ask each to show you on the roof or in their photographs. It changes the conversation.

Do not sign anything on the doorstep. Read any contract twice before you sign it; most home improvement contracts in California can be cancelled within three business days.

Damage that matters is often invisible from the ground. Bruised shingles, lifted seals and hairline mat fractures fail years later, long after the storm is forgotten.

Locally

Behind it: wind-blown embers landing in the valleys. Most houses lost to wildfire are lost to embers arriving ahead of the fire, not to the fire itself.

About storm damage here

Can I just put a new roof over the old one?

Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.

Should I take the cheapest quote?

Not automatically. Put the quotes side by side on layers, not on totals — underlayment, ice-and-water, drip edge, valley treatment, ventilation, decking allowance, warranty. Cheap usually means less of those, not the same roof for less money.

Are the contractors licensed and insured?

We require a licence number and current insurance from every contractor in the network. Verify it yourself anyway. Your state licensing board has a free lookup, and it takes two minutes.

How long does a re-roof take?

A straightforward asphalt roof on an average house is one to three days. Tile, slate and complex rooflines take longer, and weather stops work more often than anything else.

Find out what it costs

No cost. We email you once when a provider near you can take it on.