Guide
The questions that separate the quotes
Ask all three contractors the same list. Comparing the answers is far more revealing than comparing the totals.
Or call (909) 729-4898Get it looked at
Three questions, and up to three Pomona contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Pomona and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
"What does your workmanship warranty cover, and for how long?"
Ask for it in writing, in the company name, with a term. Five to ten years is common; the term matters less than whether they will still be trading.
"Who is actually doing the work?"
Ask how long this specific crew has worked together. Roofing companies keep their name and change their hands more often than most trades.
"What is your licence number, and who holds it?"
Then look it up. You are checking that the licence is current and that the name on it matches the name on the contract you are being asked to sign.
"What happens if the decking is rotten?"
You want a rate, not a reassurance. Some rot is likely on any older roof and the rate is the only thing that keeps that predictable.
"What underlayment, and how are the valleys done?"
A contractor who enjoys this question is usually the one whose roof lasts. A contractor who deflects it to brand names is quoting a different job.
"Can I see a job you finished five years ago?"
Recent work shows tidiness. Older work shows competence. Ask for the older one.
In short
Six questions, three contractors, one afternoon. It is the cheapest insurance available on a job this size.
Related questions
Should I take the cheapest quote?
Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.
Are the contractors licensed and insured?
Contractors have to give us their state licence number and proof of liability and workers compensation cover before they can receive requests. You should still ask to see current certificates yourself before work starts — a licence can lapse between checks.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Find out what it costs
No cost, no obligation, and never more than three contractors.